How to Follow the FDOT Protocols
1. Obtain the necessary permits and licenses from the Florida Department of Transportation (FDOT).
2. Identify the type of structure you plan to build. Different materials, such as concrete, steel, or wood, may be required depending on the type of structure you plan to build.
3. Develop plans and specifications for the building. These plans must meet the FDOT’s design standards and requirements.
4. Acquire the necessary materials for the building. Make sure to purchase the appropriate materials for the type of structure you are building.
5. Construct the building. Make sure to follow all safety protocols, such as wearing protective gear and using the proper tools, to ensure your safety.
6. Inspect the building to ensure it meets the FDOT’s standards and requirements.
7. Obtain a final approval from the FDOT before opening the building to the public.